Lowest price or best value? How to read the scoring rules in a public tender
Every public tender says how offers will be scored. Learn to find the weights, read the formula and work out what a cheaper price, a faster delivery or one more reference is worth in points before you write a bid.

Before you decide whether to bid for a public contract, find the award criteria: the rules the buyer will use to rank the offers. They are printed in the tender notice. Either the cheapest offer that meets the requirements wins, or the buyer also scores something else, such as delivery time, references or a demonstration, each with a fixed weight. When there is a formula, use it to put a number on a trade-off: how many points a higher price costs you, and how many points a faster delivery or an extra reference earns. Most Slovak and Czech IT tenders are scored on price alone, so the exceptions deserve a close read.
1. Where the scoring rules are
EU public tenders are published on TED (Tenders Electronic Daily), the EU's official journal for public contracts. Each notice has a section on award criteria, usually per lot (a lot is a part of a tender that is awarded separately). For each criterion it gives a name, a type (price, cost or quality), a weight and often a description with the formula.
Weights come in two forms. Some notices give percentages ("s vahou 100 %", with a weight of 100%); others give points ("x 60 bodov", times 60 points). They mean the same thing: the share of the total score that each criterion controls.
2. Price only: the cheapest compliant offer wins
When price has a weight of 100, the buyer ranks the offers that meet every requirement purely by price. Czech notices often still call this "economic advantageousness" (ekonomická výhodnost), then add "according to the lowest bid price". The phrase does not mean quality is scored.
On 27 November 2026 Evolc Signals listed 118 open calls for tenders from Slovak and Czech buyers in software (CPV division 48) and IT services (division 72). CPV is the EU's common classification of what is being bought. We opened the TED data of every one. One hundred were scored on price alone, 12 gave weight to something else, and 6 did not state the criteria in the notice data.
Price-only does not mean small or simple. The Slovak Centre of Scientific and Technical Information is buying a national system for recording and managing research projects, NEMPA, estimated at €5,688,338.10, and its notice scores only the "lowest price in EUR including VAT for the whole subject of the contract". In such tenders quality is set as a minimum, not scored: the specification, the contract terms and the qualification requirements (for example past contracts of a given size) decide who may compete, and price decides who wins among them.

3. Small quality weights can still be price tenders
A quality criterion does not always change much. The Czech Ministry of Labour and Social Affairs is buying support and development of its system for insurance benefits, estimated at CZK 160,054,140. Its notice gives price a weight of 95% and the "technical level of cyber security of the ICT environment" 5%, scored from a questionnaire the bidder fills in. The lowest price receives 100 points and every other offer receives 100 multiplied by the lowest price divided by its own price.
With that formula, an offer 10% above the cheapest loses about 9 of the 100 price points, worth about 8.6 points after the 95% weight. The whole cyber-security criterion is worth at most 5. So a supplier cannot win this one on the questionnaire alone if it is meaningfully more expensive. It can still separate close prices.
4. Read the formula, then do the arithmetic
Most formulas follow one pattern. For price, the best offer gets the full points and others get a share in proportion: lowest price ÷ your price × weight. For a number where less is better, such as days to deliver, the same shape is used with the shortest time. For points awarded by a committee, your score is divided by the best score.

5. When a committee scores the quality
Some criteria are judged by an evaluation committee against a written scale. The city of České Budějovice is buying traffic-responsive control for 41 traffic light controllers in six locations, estimated at CZK 31,116,400 (TED 805809-2026, offers due 5 January 2027). Price carries 60%, reference projects 10% and the proposed solution 30%.
The reference criterion counts projects beyond those used to qualify, from the last five years: each one covering both delivery and service earns 20 points, up to five projects and 100 points, with half points for delivery or service alone. The minimum size is CZK 2,000,000 for a delivery or CZK 300,000 a year for service. Your points are then divided by the best bidder's and multiplied by 10. If the best offer shows five full references, each of yours is worth 2 weighted points.
The solution criterion scores five themes, including a proposed algorithm, a demonstration traffic simulation and a working code sample that reads data in JSON format, at 20 points ("above standard"), 10 ("standard") or 0, and the notice describes each level. For example, an above-standard simulation is built in professional software, shows public transport priority and includes queue lengths or vehicle delays. That description is a checklist for the bid.
Fakultní nemocnice Brno gives 50% to the "user friendliness of a prototype" tested on sample tasks for its management information system (799556-2026). CESNET, the Czech research network, gives 80 points to the total RAM installed in six servers and 20 to price (827218-2026), so memory counts four times as much as price.
6. What the weights tell you, and what they do not
The weights tell you what the buyer chose to reward. A large delivery weight suggests the buyer is under time pressure, which may come from a funded project with an end date. A prototype or simulation means the buyer wants to see the product before choosing. A heavy price weight means it treats the job as well defined.
They do not tell you who will bid, how many offers will arrive or who will win. Change notices can also alter the criteria, so check that you are reading the current version on the buyer's portal before you price.
Ask your assistant to score a tender before you bid
Prompt to use with your assistant
Here is a public tender notice: [TED link or pasted text]. 1. List every award criterion per lot: name, type (price, cost or quality), weight, and the exact formula or scale. Quote the notice; translate it into English next to the original. 2. Say whether the tender is effectively price-only (price weight 90% or more, or the only criterion). 3. List any limits, such as minimum or maximum values that are scored the same. 4. Using the formulas, calculate how many weighted points we lose if our price is 5%, 10% and 20% above the cheapest offer, and how many we can gain on each non-price criterion. 5. List what the bid must contain to earn the top score on each quality criterion. 6. Check whether this notice changes an earlier one, and tell me what to confirm on the buyer's portal. Use only what the notice says. If a formula is in the tender documents and not in the notice, say so.
Try it now: open Slovak IT tenders or Czech IT tenders on Evolc Signals, pick one that fits your business and follow its link to the notice. Find the award criteria first, then run the arithmetic before you decide to bid.
























